PROJECTS

1/5
MILLFEILD PROJECT

This project was undertaken by Stabilcorp as a full service insitu stabilisation project. Working under RMS R75 Specification.
The Works involve Mill and blend exiting pavement, spread 150mm of DGB20, full service stabilisation at 350mm in depth, final trim to design levels and spray sealed with a 14/10 hot bitumen  seal  for 4,700m2 located on Wollombi Road.

1/2
ELARA BASIN MARSDEN PARK 

Stabilcorp was involved with the stabilisation of material onsite to spread and mix to depths of 500mm. This stabilised material was then used in the construction of the basin walls. See video below of the final product.

https://youtu.be/dBxSyUhHIk8

1/3
HAMMEL HILL ARMIDALE

This project was undertaken by Stabilcorp as a full service insitu stabilisation project. Working under RMS R75 Specification.
The Works involve 90m3 of Shoulder works, 1200 ton MB20 correction coarse and full service stabilisation for 4,800m2 located on Waterfall Way.

1/3
PACIFIC HIGHWAY

Stabilcorp has a purpose built shoulder paving skid steer attachment which can widen the shoulder of the road from 500mm to 2.3m in one sigle pass.

This peice of plant is RMS approved and has completed over 250,000km along the Pacific Hwy and throughout NSW.

Client such as Downer, Seymour Whyte, Fulton Hogan, BGC and Lend Lease have all used this machine. See video below to see ShoulderMaster in action

https://vimeo.com/376724888

© 2020 by Stabilcorp Pty Ltd